
E-S 1000D Series Instruction Manual
Installation of Operator—Pull-to-Open
2.6
Before permanently attaching any brackets, be sure to test arm motion
and clearance.
7) Place the upper “L” shaped bracket and
the boomerang bracket on the lower “L”
shaped bracket. Position the brackets in the
setback that is being used.
8) With the 3 brackets clamped together,
mark then drill the upper “L” shaped brack-
et in place and attach it using 3/8” carriage
bolts. [See Fig. 5]
9) Drill through the center hole of the “L”
shaped set to penetrate the boomerang
bracket. Double check the setback on the
boomerang bracket.
10) Drill the set hole through all 3 brackets
using a 5/16” drill bit in an area behind the
first hole. Secure the hole with a 5/16” bolt
and the provided nuts and lock washers.
[See Fig. 6]
Fig 5
Fig 6
Continue on next page.
Komentarze do niniejszej Instrukcji